In the field of medical devices, the following projects have been performed:
- 2008-2009 - Establishment of an SOP system and validation of diagnostic systems (retrospectively and prospectively)
- 2007-2008 - Validation of a cleanroom monitoring in a Medical Device Manufacturer
- 2006 - Validation of an in vitro diagnostic software and the skills of the IT infrastructure
- 2005-2006 - Validation of an ERP system for production planning and control of a Medical Device Manufacturer
- 2005 - Validation of a clinical database of a medical device manufacturer